Master Category Setup

Master Category Setup

This screen must be setup before setting up Master Phase Codes structures.

The objective is to use common descriptions across all your phase code structures in order to keep this clear and concise for your users.

Setup the minimum number of categories.

For example:
  1. Department
  2. Level
  3. Area
  4. Trade
  5. Activity
    • Related Articles

    • Master Phase Code Screen

      Before setting up this screen, you need to first setup the MASTER CATEGORY SETUP screen. This setup screen is designed to break the phase code into segments, and then assign descriptions to the codes inside each segment. Example: Phase Code Structure ...
    • Master Shop Schedule

      The Master Shop Schedule provides an interface where the shop manager can see the entire shop schedule requirements based on the onsite dates the project managers, supervisors or foremen has entered across all jobs.  This is designed to manage a ...
    • Calendar Setup

      The calendar setup screen allows you to setup calendars that can be used on the Gantt scheduling screen. Calendar Settings Calendar Name Set as default Allow Saturday as work day Allow Sunday as work day Set hours per day One of these calendars must ...
    • Company Setup

      These are the main setup entries for your company. The top section shows some basic information about your company. These cannot be edited. ERP System Setup This section is used by JSF to connect to your Spectrum ERP system. Data Filters Setup This ...
    • Workflow Setup

      The screen has three workflows that you can setup.       Drawing       Shop       Field Each one can have different workflow steps. Columns Step - this is the step number in sequence.  The first step is the default when a new task is created. Drag ...